Bare-metal GPUs
Bare-metal GPUs for inference, deployed fast
Dedicated NVIDIA nodes for AI companies that need inference capacity now, scaling on energy we generate ourselves.
Dedicated nodes · 1, 2 or 3-year terms
Order form
GPU reservation
- Capacity
- 64 GPUs, reserved
- Term
- 1 year
- Tenancy
- Yours alone
- Billing starts
- At go-live
Sign here

In operation
4years

Running today
25MW

Sites built and run
4sites

Portfolio in development
2.5GW
Compute
Three ways to buy
Reserve steady GPUs, run checkpointed work on interruptible capacity, or bring your own GPUs and run them on our power.
Dedicated GPU nodes
Rate by term · 1 to 3 yearsfrom-price to publish
Whole NVIDIA nodes, reserved for you alone and configured to your workload. They run every hour on the steady band, backed by the site’s firming.
- 1, 2 or 3-year terms, set per deal
- Bare metal, managed Kubernetes or Slurm
- Resell the capacity under your own brand
Fits production inference, agents, anything behind your own SLA
Interruptible compute
30–50% below dedicatedto confirm
Pauses only for energy reasons, with notice first, then resumes. It is never reclaimed without warning, which suits checkpointed work better than spot.
- Notice before every pausenotice to confirm
- Not served, not billed
- Burst into it from your dedicated nodes
Fits batch inference, evals, checkpointed training, background agents
Bring your GPUs
Per kW-month · power includedrate to confirm
Powered colocation for hardware you own. We supply the energy, the site and the operations, without the wait for grid-connected colo.
- Steady and interruptible power on one site
- Hardware on your balance sheet
- Racked and operated by our team
Fits inference providers and neoclouds, from a few racks to a campus
Why we’re fast
How do we deploy so fast?
Four choices that only work together: modules we can place in weeks, energy nobody else wants, land nobody else is fighting for, and compute that bends to the energy.
01
Modular
Sites are built from modules that arrive racked and tested. They drop onto a pad and plug in, so a site grows a block at a time, not a building at a time.
02
Stranded energy
We build on energy nobody wants: gas a well would flare, wind and solar the grid can’t take. Putting it to use is welcome, so permitting moves fast, and it never has to cross the public grid.
03
Patagonia
We deploy where nobody else is competing for power or land. No bidding war for a site, no line of data centers waiting for the same substation.
04
Flexible compute
Interruptible compute takes every swing of a stranded source, so the reserved GPUs above it get a steady band. That is what makes wasted energy usable for AI.
An illustrative day at a 12 MW site
- Day average
- 00:00–24:00
- Energy available
- 11.3 MW
- GPUs, steady
- 4.0 MW
- Interruptible compute
- 7.3 MW
- Grid firming
- 0.0 MW
Illustrative sample day for each source. The split between GPUs and interruptible compute is modeled.
Field notes
From our sites in Patagonia.

01 · Wellhead
The gas a well would flare. This is where our power starts.

02 · Switchgear
Commissioning the board that feeds the modules.

03 · Delivery
A module arrives, racked and tested, ready to place.

04 · Los Toldos
A row in service at the site’s fence line.

05 · Dusk
The flare we’re here to put out.
Tell us what you need to run
Looking for compute capacity, a site for your campus, or a partner for your energy? Tell us what you need and the right person will get back to you.
We reply within 48 hours. [email protected]