Site AA 2 GW campus
Open land for a gigawatt-scale campus, with the power developed alongside it.
- Capacity
- 2GW
- Online
- 2028
- Status
- Under development
AI campuses · 2.5 GW under development
Two campus sites under development: a 2 GW campus and a 450 MW campus, both online in 2028. For hyperscalers and neoclouds that need power soon, and the energy companies whose power we turn into demand.
For hyperscalers & neoclouds
Our sites
2.5GWunder development
Two campus sites, both online in 2028. Names and locations are shared under NDA.
Site AOpen land for a gigawatt-scale campus, with the power developed alongside it.
Site BA campus at a high-voltage node, now going through the grid interconnection process.
Who we build with
“Unblock has been a phenomenal partner for us to grow and scale our business in Argentina.”
Chase Lochmiller
Co-founder & CEO, Crusoe
For energy companies
If you have energy in Argentina that can’t reach a buyer, gas without a pipeline, curtailed wind and solar, a congested node, we bring the compute that buys it. We finance and run the data center; you sell energy you’d otherwise lose.
Demand on your site
Compute sized to your energy, placed next to it.
We finance it
The data center is ours to build and run.
Buyers we bring
AI and compute customers for your power.
OperationalVaca Muerta, Argentina · 2023
Tecpetrol’s associated gas at Los Toldos had no pipeline to reach. We built compute at the wellhead, so the gas has a buyer on site and the wells keep producing.
OperationalVaca Muerta, Argentina · 2022
Pluspetrol had gas with no pipeline access. We financed and built the data center, so that gas now earns revenue, with zero capital from Pluspetrol.
OperationalVaca Muerta, Argentina · 2026
After the first site, Tecpetrol asked us to take more of their gas. The expansion runs beside the original site.
Under developmentWind · behind the meter
A data center on site at a wind project, so the wind farm sells its power to compute next door instead of waiting on the grid.
“Thanks to Unblock, we were able to produce 2,000 barrels of oil per day, which we otherwise wouldn’t have been able.”
Tell us about the campus you want to build, or the energy you can’t sell. We’ll tell you which of our sites fits, or whether compute can put your energy to work.
We reply within 48 hours. [email protected]